VECTORDEFENCE DRONE
INTELLIGENCE
INDEPENDENT PERSPECTIVE
THE EVOLVING FIELD GUIDE
Editor

Air · Loitering munition

SHADOW 25

Jet-powered SHADOW configuration included in a documented UAE Armed Forces procurement announcement.

Role & capabilities

  • Loitering munition programme
Order / production commitmentOrder / production commitment
Primary domain
Air
System type
Loitering munition
Developer / manufacturer
ADASI / EDGE
Origin / production countries
United Arab Emirates
Other names
No additional names recorded
Variants / configurations
SHADOW 25
Operators / programme customers
UAE Armed Forces — order announced; deliveries not quantified

Evidence & current status

2023 contract covers two SHADOW types; per-type acceptance and delivery totals remain unverified.

SHADOW 25 is the jet-powered member of ADASI’s SHADOW range. EDGE’s current product page supplies dimensions, a one-hour endurance claim and maximum speed. Its 2025 catalogue provides a fuller mass baseline. The February 2023 contract announcement names both SHADOW 25 and SHADOW 50 for the UAE Armed Forces.

The shared contract supports an order classification, but it does not provide separate delivered quantities or a current operational inventory for either aircraft. The two configurations need separate profiles: their propulsion and endurance differ substantially in the versioned catalogue.

The displayed performance describes supplier claims under unspecified mission conditions. In particular, the stated communications reach must not be presented as an equivalent mission radius or total flight distance. Later exhibitions or repeat contract references do not constitute additional procurement events unless the announcement identifies a new commitment.

Sourced specifications

Figures apply to the named configuration. Maximum values are not guaranteed operating performance.

SpecificationReported valueContext & source
AirframeNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source ↗
Launch / recoveryNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source ↗
PropulsionJetSHADOW 25 configuration. Source ↗
Dimensions2.17 m span; 2.25 m lengthCurrent product page. Source ↗
Mass103 kg maximum take-off massFebruary 2025 catalogue. Source ↗
Endurance60 minutesSupplier claim. Source ↗
Range100 km datalink reachCommunications figure, not aircraft range. Source ↗
SpeedUp to 450 km/hMaximum claim, not cruise. Source ↗
AltitudeNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source ↗
PayloadNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source ↗
SensorsNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source ↗
Communications / navigationNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source ↗

Publication history

  • — Added in the September 2026 global coverage review, with sources, configuration limits and explicit data gaps.

Suggest a correction to this entry →

Follow the evidence

Source types identify who makes the claim. Programme milestones and supplier statements should be read in context.

  1. EDGE SHADOW 25 product page (opens in a new tab)Manufacturer
  2. EDGE product catalogue, February 2025 (opens in a new tab)Manufacturer
  3. EDGE SHADOW 25/50 UAE contract, 21 February 2023 (opens in a new tab)Manufacturer

Explore the connections

Manufacturer indexUnited Arab Emirates

EDGE / ADASI

Aircraft and programme links: REACH-S, GARMOOSHA.

Reviewed 20 Sept 2026Read
Air · Coverage auditMiddle East

Middle East defence drone coverage audit

6 original research topics reviewed: 0 resolved, 6 partially resolved and 0 still open. The remaining register identifies specific evidence needs.

Reviewed 21 Sept 2026Read