Documented programme milestone
2026-09-16: Ratel reports a separate armed integration under test; baseline logistics service does not establish acceptance of that integration.
What the record establishes
The linked source is the basis for this dated programme briefing. The system profile records the wider configuration, customer and technical evidence. Its current status group is in service / use documented.
Payload is stated as both 400 kg and ≥500 kg on one manufacturer page; range is stated as both ≥55 km and ≤55 km. Neither is resolved into a definitive specification here.
Follow the programme
Read the connected system profile for the full source trail and configuration-specific specifications. This briefing records a documented milestone; its publication here is not a claim that the underlying event happened today. Later changes belong in a subsequent update and a reviewed reference entry.
Publication history
- — Added a sourced land programme briefing linked to its reference profile.
Suggest a correction to this entry →
Follow the evidence
Source types identify who makes the claim. Programme milestones and supplier statements should be read in context.